ShanBo
English
You are here: Home>News

-News-

Chinese Customers Visit Bulldozer Factory and Production Workshop, Inquire About and Purchase SD22 S

Date: 2026-04-24 14:35:40Views: 32

🏭 Recently, a group of Chinese customers made a special visit to our professional bulldozer manufacturing factory and production workshop, focusing on inquiring about and inspecting the SD22 standard version bulldozer equipped with a ripper. After in-depth communication regarding product quality, performance testing, and configuration requirements, the customers formally confirmed their purchase intention, aiming to apply the equipment to earthwork construction, bulk material handling, and related projects.

🚜 The SD22 standard version bulldozer is a high-performance, durable product developed and designed using patented technology. It can be equipped with various work implements and cabs and is an ideal machine for earthwork construction and bulk material handling. On this occasion, the Chinese customers focused their inquiry and purchase on the SD22 model equipped with a ripper, further enhancing the equipment's adaptability to complex working conditions.

Chinese clients visit bulldozer factory

SD22 Standard Edition Bulldozer with ripper

Bulldozer production workshop assembly line

💪 In terms of the power system, the SD22 is equipped with a WP12/QSNT-C235 electronically controlled engine, meeting China's Stage III emission requirements for non-road machinery. It delivers strong power, high efficiency and energy savings, and low maintenance costs. The rated power reaches 175 kW, and the high torque reserve coefficient ensures stable power output under heavy loads. The radially sealed intake system effectively extends engine service life and supports long-term continuous operation.

⚙️The SD22 has an operating weight of 23,450 kg, a minimum turning radius of 3,300 mm, a ground pressure of 66 kPa, a ground clearance of 405 mm, and a ground contact length of 2,730 mm. The stable and reliable undercarriage system, combined with optional track shoe widths of 560 mm, 610 mm, and 660 mm, ensures smooth travel and good passability, making it suitable for various harsh working conditions.

🛠️The SD22's work implements can be flexibly configured according to specific working conditions. The ripper selected by the customer this time (single-shank/three-shank) has maximum ripping depths of 695 mm (single-shank) and 666 mm (three-shank), enabling efficient ripping of hard soil and rock to meet the customer's earthwork construction needs. The machine can also be equipped with various blade types such as straight blade, angle blade, and U-blade, providing strong operational adaptability.

🏡 In terms of the driving environment, the SD22 is equipped with a hexagonal cab featuring a spacious interior and wide field of view. FOPS/ROPS can be provided as needed to ensure operational safety. Electronic hand and foot throttle control makes operation more precise and comfortable, while the intelligent display and control terminal and heating and air conditioning provide a user-friendly driving experience.

SD22 bulldozer engine details

SD22 Standard Edition Bulldozer with ripper

Clients consult SD22 bulldozer parameters

🔧The SD22 also offers excellent maintainability: structural components inherit the excellent quality of mature products, electrical harnesses are protected by corrugated tubing, and the open large-space side guards and external lubrication and maintenance points make routine maintenance convenient and quick, greatly reducing the customer's later maintenance costs.

🤝 During the visit, the Chinese customers carefully inspected the factory's production processes, assembly lines, and finished-product inspection procedures, and highly recognized the production technology, quality control system, and product performance of the SD22 standard version bulldozer. Both parties held in-depth discussions on product configuration, delivery lead time, after-sales service, and other issues, laying a solid foundation for smooth cooperation.

🌍 As a professional bulldozer manufacturer, we are committed to providing domestic customers with high-quality, high-performance construction machinery. With its reliable performance, flexible configuration, and high cost-effectiveness, the SD22 standard version bulldozer will help customers improve construction efficiency, reduce operating costs, and create more value for various earthwork construction projects.