Tonnage: Under 13 t
Compact dimensions, agile steering, easy operation and low fuel consumption.
Tonnage: 13–23 t
Balanced power, broad application and good value.
Tonnage: Over 23 t
Powerful engines, strong traction, large blades and a durable structure for demanding work.
Tonnage: 1–6 t
Compact, maneuverable, easy to relocate and fuel-efficient.
Tonnage: 6–13 t
Versatile compact excavators offering good value for general construction.
Tonnage: 13–30 t
Versatile flagship models for a broad range of excavation tasks.
Tonnage: 30–50 t
High efficiency and large bucket capacity for heavy-duty work.
Tonnage: 4–20 t
High mobility with low transport costs and reduced impact on paved surfaces.
Tonnage: Under 3 t
Compact, maneuverable and fuel-efficient for work in tight spaces.
Tonnage: 3–6 t
Steady performance, strong load capacity and smooth, energy-efficient operation.
Tonnage: Over 6 t
Heavy-duty construction, strong output and high efficiency for large projects.
Tonnage: Under 2.5 t
Compact size, zero-radius turning and quick attachment changes for versatile operation.
Tonnage: 4 to 8 t and above
Strong digging force, load capacity and stability for heavy-duty work.
Tonnage: 10–25 t
Compact, easy to relocate and stable for small and medium pipeline projects.
Tonnage: 25–45 t
Balanced lifting performance, stability and traction for a wide range of pipeline work.
Tonnage: Over 45 t
High lifting capacity, strong traction and a stable chassis for heavy, large-diameter pipes.
Tonnage: 6–26 t
Deep compaction, strong vibration and traction for road foundations.
Tonnage: 3–14 t
Dual-drum vibration and uniform compaction for smooth asphalt surfaces.
Tonnage: 16–30 t
Kneading compaction for dense, uniform surfaces, mainly for final asphalt compaction.
Tonnage: 0.8–3 t
Compact, easy to operate and maneuverable in confined spaces.
Tonnage: 20–35 t
Strong compaction, a durable structure and wear and corrosion resistance for landfill work.
Expert support · Worldwide shipping
Continuity in heavy-duty dozing is not just a matter of horsepower. Starting from the downtime risks···
Dump trucks queuing for loading indicates the loading step may be the bottleneck in the work chain. ···
When a project involves both conventional earthmoving and work in swamps, riverbanks or soft ground,···
Before deciding whether to use a 37-ton crawler excavator for large earthworks and quarries, first c···
When an earthwork line involves both rough site grading and short-distance pushing, there is often a···
On landfill compactor spec pages, crushing width and ground clearance are often skimmed as ordinary ···
In asphalt surface compaction, layer thickness and mix type determine the compaction energy requirem···
Earthwork sites often combine excavation and truck loading in one cycle. Which side the work focus l···
Small-site earthwork leveling often involves narrow work areas, frequent relocations and uncertain g···
In slope earthworks, an excavator must not only climb the slope but also remain stable on the face a···
When urban municipal works and green mining projects have real requirements for zero emissions and l···
When truck tonnage and excavator size do not match, the loading cycle often gets stuck on bucket cap···
We manufacture bulldozers, excavators, loaders, road rollers, pipe layers and attachments for a wide range of construction projects.
© 2026 Shanbo Construction Machinery All rights reserved.