Tonnage: Under 13 t
Compact dimensions, agile steering, easy operation and low fuel consumption.
Tonnage: 13–23 t
Balanced power, broad application and good value.
Tonnage: Over 23 t
Powerful engines, strong traction, large blades and a durable structure for demanding work.
Tonnage: 1–6 t
Compact, maneuverable, easy to relocate and fuel-efficient.
Tonnage: 6–13 t
Versatile compact excavators offering good value for general construction.
Tonnage: 13–30 t
Versatile flagship models for a broad range of excavation tasks.
Tonnage: 30–50 t
High efficiency and large bucket capacity for heavy-duty work.
Tonnage: 4–20 t
High mobility with low transport costs and reduced impact on paved surfaces.
Tonnage: Under 3 t
Compact, maneuverable and fuel-efficient for work in tight spaces.
Tonnage: 3–6 t
Steady performance, strong load capacity and smooth, energy-efficient operation.
Tonnage: Over 6 t
Heavy-duty construction, strong output and high efficiency for large projects.
Tonnage: Under 2.5 t
Compact size, zero-radius turning and quick attachment changes for versatile operation.
Tonnage: 4 to 8 t and above
Strong digging force, load capacity and stability for heavy-duty work.
Tonnage: 10–25 t
Compact, easy to relocate and stable for small and medium pipeline projects.
Tonnage: 25–45 t
Balanced lifting performance, stability and traction for a wide range of pipeline work.
Tonnage: Over 45 t
High lifting capacity, strong traction and a stable chassis for heavy, large-diameter pipes.
Tonnage: 6–26 t
Deep compaction, strong vibration and traction for road foundations.
Tonnage: 3–14 t
Dual-drum vibration and uniform compaction for smooth asphalt surfaces.
Tonnage: 16–30 t
Kneading compaction for dense, uniform surfaces, mainly for final asphalt compaction.
Tonnage: 0.8–3 t
Compact, easy to operate and maneuverable in confined spaces.
Tonnage: 20–35 t
Strong compaction, a durable structure and wear and corrosion resistance for landfill work.
Expert support · Worldwide shipping
When earthmoving push volumes fluctuate, specifying equipment for peak demand at once tends to leave···
Small bulldozers are not suitable for every earthwork scenario. Using verified SD10 data as a refere···
This article addresses whether an electric dozer can directly replace a diesel machine for full-shif···
In dozer selection, material type and site conditions often determine the version direction earlier ···
Two dozers with the same horsepower are not interchangeable. Using the Shanbo SD26 series 260 hp doz···
Before a bulldozer is delivered, confirming the equipment by horsepower alone can lead to mismatches···
The challenge of dozing on soft, wet ground is not horsepower but ground pressure, track configurati···
Small dozers are often used for both earthmoving and site grading, but the two tasks demand differen···
☀️SD22 Bulldozer Farmland Field Test on a Sunny Day. Our SD22 bulldozer successfully completed a rea···
☀️SD22 Bulldozer Clear-Weather Farmland Field Test Our SD22 bulldozer successfully completed a clear···
Deep in the South American tropical rainforest, where the terrain is harsh and muddy, the SH240-8 23···
At an open test site, our factory's technical team conducted comprehensive field testing of the E22 ···
We manufacture bulldozers, excavators, loaders, road rollers, pipe layers and attachments for a wide range of construction projects.
© 2026 Shanbo Construction Machinery All rights reserved.