Tonnage: Under 13 t
Compact dimensions, agile steering, easy operation and low fuel consumption.
Tonnage: 13–23 t
Balanced power, broad application and good value.
Tonnage: Over 23 t
Powerful engines, strong traction, large blades and a durable structure for demanding work.
Tonnage: 1–6 t
Compact, maneuverable, easy to relocate and fuel-efficient.
Tonnage: 6–13 t
Versatile compact excavators offering good value for general construction.
Tonnage: 13–30 t
Versatile flagship models for a broad range of excavation tasks.
Tonnage: 30–50 t
High efficiency and large bucket capacity for heavy-duty work.
Tonnage: 4–20 t
High mobility with low transport costs and reduced impact on paved surfaces.
Tonnage: Under 3 t
Compact, maneuverable and fuel-efficient for work in tight spaces.
Tonnage: 3–6 t
Steady performance, strong load capacity and smooth, energy-efficient operation.
Tonnage: Over 6 t
Heavy-duty construction, strong output and high efficiency for large projects.
Tonnage: Under 2.5 t
Compact size, zero-radius turning and quick attachment changes for versatile operation.
Tonnage: 4 to 8 t and above
Strong digging force, load capacity and stability for heavy-duty work.
Tonnage: 10–25 t
Compact, easy to relocate and stable for small and medium pipeline projects.
Tonnage: 25–45 t
Balanced lifting performance, stability and traction for a wide range of pipeline work.
Tonnage: Over 45 t
High lifting capacity, strong traction and a stable chassis for heavy, large-diameter pipes.
Tonnage: 6–26 t
Deep compaction, strong vibration and traction for road foundations.
Tonnage: 3–14 t
Dual-drum vibration and uniform compaction for smooth asphalt surfaces.
Tonnage: 16–30 t
Kneading compaction for dense, uniform surfaces, mainly for final asphalt compaction.
Tonnage: 0.8–3 t
Compact, easy to operate and maneuverable in confined spaces.
Tonnage: 20–35 t
Strong compaction, a durable structure and wear and corrosion resistance for landfill work.
Expert support · Worldwide shipping
🏗️ Cross-border good news | Algerian delegation visits Chinese construction machinery factory, signs···
🚜 SD32 320HP bulldozer on-site testing successfully completed, ready for official shipment to Algeri···
🏭 Domestic customer visits factory to inspect and purchase SD46 bulldozer and SH220 excavator 📅 Rece···
The guests conducted a comprehensive inspection of our company's modern bulldozer and excavator prod···
A warm welcome to our customers from Guatemala! The Central American customers visited our bulldozer···
🏭 Recently, a group of Chinese customers made a special visit to our professional bulldozer manufact···
🏭 Recently, a delegation of Russian clients made a special trip to our professional bulldozer manufa···
🤝 In a new round of in-depth cooperation, our long-term Russian client once again visited our China ···
🏭 Recently, we warmly received a Vietnamese customer delegation visiting our professional bulldozer ···
🏭 We warmly welcome customers from Bangladesh to our professional bulldozer manufacturing factory, w···
🚛 SH60 crawler excavator exported to Poland | Factory works overtime to load and ship immediately. W···
Welcoming UK customers to visit our excavator factory in Jining, China. They toured the excavator pr···
We manufacture bulldozers, excavators, loaders, road rollers, pipe layers and attachments for a wide range of construction projects.
© 2026 Shanbo Construction Machinery All rights reserved.