Tonnage: Under 13 t
Compact dimensions, agile steering, easy operation and low fuel consumption.
Tonnage: 13–23 t
Balanced power, broad application and good value.
Tonnage: Over 23 t
Powerful engines, strong traction, large blades and a durable structure for demanding work.
Tonnage: 1–6 t
Compact, maneuverable, easy to relocate and fuel-efficient.
Tonnage: 6–13 t
Versatile compact excavators offering good value for general construction.
Tonnage: 13–30 t
Versatile flagship models for a broad range of excavation tasks.
Tonnage: 30–50 t
High efficiency and large bucket capacity for heavy-duty work.
Tonnage: 4–20 t
High mobility with low transport costs and reduced impact on paved surfaces.
Tonnage: Under 3 t
Compact, maneuverable and fuel-efficient for work in tight spaces.
Tonnage: 3–6 t
Steady performance, strong load capacity and smooth, energy-efficient operation.
Tonnage: Over 6 t
Heavy-duty construction, strong output and high efficiency for large projects.
Tonnage: Under 2.5 t
Compact size, zero-radius turning and quick attachment changes for versatile operation.
Tonnage: 4 to 8 t and above
Strong digging force, load capacity and stability for heavy-duty work.
Tonnage: 10–25 t
Compact, easy to relocate and stable for small and medium pipeline projects.
Tonnage: 25–45 t
Balanced lifting performance, stability and traction for a wide range of pipeline work.
Tonnage: Over 45 t
High lifting capacity, strong traction and a stable chassis for heavy, large-diameter pipes.
Tonnage: 6–26 t
Deep compaction, strong vibration and traction for road foundations.
Tonnage: 3–14 t
Dual-drum vibration and uniform compaction for smooth asphalt surfaces.
Tonnage: 16–30 t
Kneading compaction for dense, uniform surfaces, mainly for final asphalt compaction.
Tonnage: 0.8–3 t
Compact, easy to operate and maneuverable in confined spaces.
Tonnage: 20–35 t
Strong compaction, a durable structure and wear and corrosion resistance for landfill work.
Expert support · Worldwide shipping
Auxiliary hauling in mining areas is often not a single task but a mix of material transfer, road ma···
When dozing on wet soft ground, a medium bulldozer cannot be judged by horsepower alone. Based on th···
If a mid-size dozer is configured only for general earthmoving and loose material pushing, mismatche···
Earthmoving projects with long continuous work hours need to confirm single-shift duration, refuelin···
Medium dozers often come in multiple versions such as standard, extended, super wetland, coal, and s···
Small dozers are often assumed to be limited to light work, but equipment capability depends on matc···
When urban low-carbon sites consider replacing diesel equipment with electric bulldozers, power capa···
Continuous push operations in mines raise a series of questions about vibration absorption, ground p···
Dozing operations in port bulk stockyards differ from ordinary earthmoving: materials are loose, sto···
Bulldozers are often discussed by horsepower class, yet the same power class can include standard, w···
Selection for material pushing tasks is often dominated by a maximum-spec mindset, but whether a mac···
This article addresses the practical scenario of procurement personnel reading hydrostatic bulldozer···
We manufacture bulldozers, excavators, loaders, road rollers, pipe layers and attachments for a wide range of construction projects.
© 2026 Shanbo Construction Machinery All rights reserved.