Tonnage: Under 13 t
Compact dimensions, agile steering, easy operation and low fuel consumption.
Tonnage: 13–23 t
Balanced power, broad application and good value.
Tonnage: Over 23 t
Powerful engines, strong traction, large blades and a durable structure for demanding work.
Tonnage: 1–6 t
Compact, maneuverable, easy to relocate and fuel-efficient.
Tonnage: 6–13 t
Versatile compact excavators offering good value for general construction.
Tonnage: 13–30 t
Versatile flagship models for a broad range of excavation tasks.
Tonnage: 30–50 t
High efficiency and large bucket capacity for heavy-duty work.
Tonnage: 4–20 t
High mobility with low transport costs and reduced impact on paved surfaces.
Tonnage: Under 3 t
Compact, maneuverable and fuel-efficient for work in tight spaces.
Tonnage: 3–6 t
Steady performance, strong load capacity and smooth, energy-efficient operation.
Tonnage: Over 6 t
Heavy-duty construction, strong output and high efficiency for large projects.
Tonnage: Under 2.5 t
Compact size, zero-radius turning and quick attachment changes for versatile operation.
Tonnage: 4 to 8 t and above
Strong digging force, load capacity and stability for heavy-duty work.
Tonnage: 10–25 t
Compact, easy to relocate and stable for small and medium pipeline projects.
Tonnage: 25–45 t
Balanced lifting performance, stability and traction for a wide range of pipeline work.
Tonnage: Over 45 t
High lifting capacity, strong traction and a stable chassis for heavy, large-diameter pipes.
Tonnage: 6–26 t
Deep compaction, strong vibration and traction for road foundations.
Tonnage: 3–14 t
Dual-drum vibration and uniform compaction for smooth asphalt surfaces.
Tonnage: 16–30 t
Kneading compaction for dense, uniform surfaces, mainly for final asphalt compaction.
Tonnage: 0.8–3 t
Compact, easy to operate and maneuverable in confined spaces.
Tonnage: 20–35 t
Strong compaction, a durable structure and wear and corrosion resistance for landfill work.
Expert support · Worldwide shipping
Daily cover and waste mass compaction in landfills are often treated as the same task, but their equ···
For compaction work in municipal maintenance and general foundation reinforcement, this explains whe···
Earthmoving tasks on narrow sites are constrained by machine width, turning space and ground bearing···
In heavy-duty dozing, undercarriage impacts come from ground undulations, material resistance, and s···
Earthwork projects progress from ordinary backfill to rock stripping, with material difficulty incre···
Bulldozer product lines are often divided into multiple versions such as standard, wetland, forestry···
Before starting a bulk material pushing project, equipment verification should begin with material b···
Dozing in confined areas is limited by turning space, frequent direction changes and edge-adjacent w···
When clay or frozen soil is pushed directly with a blade, the machine tends to slip and cannot push ···
For earthwork and grading on constrained sites, smaller is not always more maneuverable, nor is larg···
Whether a battery-electric bulldozer can replace a diesel one depends not only on power parameters b···
For procurement and equipment management personnel who need to verify the conditions for continuous ···
We manufacture bulldozers, excavators, loaders, road rollers, pipe layers and attachments for a wide range of construction projects.
© 2026 Shanbo Construction Machinery All rights reserved.