Tonnage: Under 13 t
Compact dimensions, agile steering, easy operation and low fuel consumption.
Tonnage: 13–23 t
Balanced power, broad application and good value.
Tonnage: Over 23 t
Powerful engines, strong traction, large blades and a durable structure for demanding work.
Tonnage: 1–6 t
Compact, maneuverable, easy to relocate and fuel-efficient.
Tonnage: 6–13 t
Versatile compact excavators offering good value for general construction.
Tonnage: 13–30 t
Versatile flagship models for a broad range of excavation tasks.
Tonnage: 30–50 t
High efficiency and large bucket capacity for heavy-duty work.
Tonnage: 4–20 t
High mobility with low transport costs and reduced impact on paved surfaces.
Tonnage: Under 3 t
Compact, maneuverable and fuel-efficient for work in tight spaces.
Tonnage: 3–6 t
Steady performance, strong load capacity and smooth, energy-efficient operation.
Tonnage: Over 6 t
Heavy-duty construction, strong output and high efficiency for large projects.
Tonnage: Under 2.5 t
Compact size, zero-radius turning and quick attachment changes for versatile operation.
Tonnage: 4 to 8 t and above
Strong digging force, load capacity and stability for heavy-duty work.
Tonnage: 10–25 t
Compact, easy to relocate and stable for small and medium pipeline projects.
Tonnage: 25–45 t
Balanced lifting performance, stability and traction for a wide range of pipeline work.
Tonnage: Over 45 t
High lifting capacity, strong traction and a stable chassis for heavy, large-diameter pipes.
Tonnage: 6–26 t
Deep compaction, strong vibration and traction for road foundations.
Tonnage: 3–14 t
Dual-drum vibration and uniform compaction for smooth asphalt surfaces.
Tonnage: 16–30 t
Kneading compaction for dense, uniform surfaces, mainly for final asphalt compaction.
Tonnage: 0.8–3 t
Compact, easy to operate and maneuverable in confined spaces.
Tonnage: 20–35 t
Strong compaction, a durable structure and wear and corrosion resistance for landfill work.
Expert support · Worldwide shipping
Earthwork leveling on narrow sites cannot be judged by horsepower alone; workspace, ground bearing c···
The equipment capability requirements for heavy-duty excavation in quarries cannot be judged by a si···
Whether a pure electric bulldozer can last a full shift depends on battery capacity, charging method···
Landfill compaction results depend on more than equipment tonnage. This article examines the relatio···
In layered subgrade compaction, lift thickness, fill material condition and shift schedule together ···
Sizing machines by bucket capacity alone often misjudges earthwork loading tasks, because single-buc···
Whether a large bulldozer can handle heavy-duty continuous dozing after entry often depends not on a···
For heavy-duty dozing tasks such as mining rock conditions, quarry extraction, and rocky soil excava···
Site leveling and medium-duty heavy dozing are often scheduled within the same project. Starting fro···
Bulldozers are often categorized into standard, coal, rock, forest, and wetland versions, which can ···
Hydrostatic bulldozers are often considered to have better fuel consumption, but before purchasing, ···
When facing multiple versions of the same medium bulldozer, procurement and technical personnel can ···
We manufacture bulldozers, excavators, loaders, road rollers, pipe layers and attachments for a wide range of construction projects.
© 2026 Shanbo Construction Machinery All rights reserved.