Tonnage: Under 13 t
Compact dimensions, agile steering, easy operation and low fuel consumption.
Tonnage: 13–23 t
Balanced power, broad application and good value.
Tonnage: Over 23 t
Powerful engines, strong traction, large blades and a durable structure for demanding work.
Tonnage: 1–6 t
Compact, maneuverable, easy to relocate and fuel-efficient.
Tonnage: 6–13 t
Versatile compact excavators offering good value for general construction.
Tonnage: 13–30 t
Versatile flagship models for a broad range of excavation tasks.
Tonnage: 30–50 t
High efficiency and large bucket capacity for heavy-duty work.
Tonnage: 4–20 t
High mobility with low transport costs and reduced impact on paved surfaces.
Tonnage: Under 3 t
Compact, maneuverable and fuel-efficient for work in tight spaces.
Tonnage: 3–6 t
Steady performance, strong load capacity and smooth, energy-efficient operation.
Tonnage: Over 6 t
Heavy-duty construction, strong output and high efficiency for large projects.
Tonnage: Under 2.5 t
Compact size, zero-radius turning and quick attachment changes for versatile operation.
Tonnage: 4 to 8 t and above
Strong digging force, load capacity and stability for heavy-duty work.
Tonnage: 10–25 t
Compact, easy to relocate and stable for small and medium pipeline projects.
Tonnage: 25–45 t
Balanced lifting performance, stability and traction for a wide range of pipeline work.
Tonnage: Over 45 t
High lifting capacity, strong traction and a stable chassis for heavy, large-diameter pipes.
Tonnage: 6–26 t
Deep compaction, strong vibration and traction for road foundations.
Tonnage: 3–14 t
Dual-drum vibration and uniform compaction for smooth asphalt surfaces.
Tonnage: 16–30 t
Kneading compaction for dense, uniform surfaces, mainly for final asphalt compaction.
Tonnage: 0.8–3 t
Compact, easy to operate and maneuverable in confined spaces.
Tonnage: 20–35 t
Strong compaction, a durable structure and wear and corrosion resistance for landfill work.
Expert support · Worldwide shipping
In municipal road subgrade compaction, before a single-drum vibratory roller enters the site, the co···
Hard rock excavation and loose soil loading are often scheduled on the same work face, but the two m···
When hauling on soft ground during the rainy season, the risk of a dozer getting stuck mainly comes ···
When selecting a large excavator, bucket capacity and digging force are often compared separately. T···
When the same bulldozer handles both general earthwork and mine support, specification decisions can···
The working capability of a heavy excavator cannot be judged by tonnage alone. Using a 37-ton-class ···
To address incomplete documentation before static-pressure bulldozer entry for earthmoving push proj···
Landfill compaction of municipal solid waste faces different materials and operating conditions than···
Municipal roadbed compaction often involves narrow working areas, variable lift thickness and freque···
In earthmoving loading, loading pace is not determined solely by excavator tonnage; it is also affec···
When one medium bulldozer spawns standard, coal, super-wetland, and sanitation versions, buyers ofte···
For procurement and construction staff who need to understand medium excavator technical specificati···
We manufacture bulldozers, excavators, loaders, road rollers, pipe layers and attachments for a wide range of construction projects.
© 2026 Shanbo Construction Machinery All rights reserved.