Tonnage: Under 13 t
Compact dimensions, agile steering, easy operation and low fuel consumption.
Tonnage: 13–23 t
Balanced power, broad application and good value.
Tonnage: Over 23 t
Powerful engines, strong traction, large blades and a durable structure for demanding work.
Tonnage: 1–6 t
Compact, maneuverable, easy to relocate and fuel-efficient.
Tonnage: 6–13 t
Versatile compact excavators offering good value for general construction.
Tonnage: 13–30 t
Versatile flagship models for a broad range of excavation tasks.
Tonnage: 30–50 t
High efficiency and large bucket capacity for heavy-duty work.
Tonnage: 4–20 t
High mobility with low transport costs and reduced impact on paved surfaces.
Tonnage: Under 3 t
Compact, maneuverable and fuel-efficient for work in tight spaces.
Tonnage: 3–6 t
Steady performance, strong load capacity and smooth, energy-efficient operation.
Tonnage: Over 6 t
Heavy-duty construction, strong output and high efficiency for large projects.
Tonnage: Under 2.5 t
Compact size, zero-radius turning and quick attachment changes for versatile operation.
Tonnage: 4 to 8 t and above
Strong digging force, load capacity and stability for heavy-duty work.
Tonnage: 10–25 t
Compact, easy to relocate and stable for small and medium pipeline projects.
Tonnage: 25–45 t
Balanced lifting performance, stability and traction for a wide range of pipeline work.
Tonnage: Over 45 t
High lifting capacity, strong traction and a stable chassis for heavy, large-diameter pipes.
Tonnage: 6–26 t
Deep compaction, strong vibration and traction for road foundations.
Tonnage: 3–14 t
Dual-drum vibration and uniform compaction for smooth asphalt surfaces.
Tonnage: 16–30 t
Kneading compaction for dense, uniform surfaces, mainly for final asphalt compaction.
Tonnage: 0.8–3 t
Compact, easy to operate and maneuverable in confined spaces.
Tonnage: 20–35 t
Strong compaction, a durable structure and wear and corrosion resistance for landfill work.
Expert support · Worldwide shipping
The same mid-size crawler bulldozer is often offered in standard, extended, super-wetland, and coal ···
In high-altitude heavy-duty excavation, continuity depends on more than tonnage. Using a condition-b···
Whether site leveling can be done with a single small bulldozer depends on the leveling area, push d···
Landfill compaction width and spreading depth are not isolated parameters; they correspond to work f···
In layered subgrade compaction, different layers have different requirements for vibration parameter···
This article examines the common assumption that a larger tonnage always means faster loading, and b···
Before an electric bulldozer is delivered, power supply and charging conditions must be verified ite···
High-volume truck loading places demands on the hydraulic response and heavy-duty continuity of larg···
Advancing a mine stripping face often involves heavy loads, continuous dozing, and gravel impact, so···
Large excavators repeatedly perform digging, swinging, dumping, and returning during loading operati···
Equipment specifications for heavy-duty dozing projects should not start from power figures. First d···
For landfill procurement staff reading compactor technical data, this explains what the crushing wid···
We manufacture bulldozers, excavators, loaders, road rollers, pipe layers and attachments for a wide range of construction projects.
© 2026 Shanbo Construction Machinery All rights reserved.