Tonnage: Under 13 t
Compact dimensions, agile steering, easy operation and low fuel consumption.
Tonnage: 13–23 t
Balanced power, broad application and good value.
Tonnage: Over 23 t
Powerful engines, strong traction, large blades and a durable structure for demanding work.
Tonnage: 1–6 t
Compact, maneuverable, easy to relocate and fuel-efficient.
Tonnage: 6–13 t
Versatile compact excavators offering good value for general construction.
Tonnage: 13–30 t
Versatile flagship models for a broad range of excavation tasks.
Tonnage: 30–50 t
High efficiency and large bucket capacity for heavy-duty work.
Tonnage: 4–20 t
High mobility with low transport costs and reduced impact on paved surfaces.
Tonnage: Under 3 t
Compact, maneuverable and fuel-efficient for work in tight spaces.
Tonnage: 3–6 t
Steady performance, strong load capacity and smooth, energy-efficient operation.
Tonnage: Over 6 t
Heavy-duty construction, strong output and high efficiency for large projects.
Tonnage: Under 2.5 t
Compact size, zero-radius turning and quick attachment changes for versatile operation.
Tonnage: 4 to 8 t and above
Strong digging force, load capacity and stability for heavy-duty work.
Tonnage: 10–25 t
Compact, easy to relocate and stable for small and medium pipeline projects.
Tonnage: 25–45 t
Balanced lifting performance, stability and traction for a wide range of pipeline work.
Tonnage: Over 45 t
High lifting capacity, strong traction and a stable chassis for heavy, large-diameter pipes.
Tonnage: 6–26 t
Deep compaction, strong vibration and traction for road foundations.
Tonnage: 3–14 t
Dual-drum vibration and uniform compaction for smooth asphalt surfaces.
Tonnage: 16–30 t
Kneading compaction for dense, uniform surfaces, mainly for final asphalt compaction.
Tonnage: 0.8–3 t
Compact, easy to operate and maneuverable in confined spaces.
Tonnage: 20–35 t
Strong compaction, a durable structure and wear and corrosion resistance for landfill work.
Expert support · Worldwide shipping
Subgrade compaction tasks often start with layer goals and then work backward to equipment condition···
When an ultra-heavy mining excavator's working range is expanded, site, transport and support condit···
In continuous heavy-load mine pushing, downtime losses often originate in multiple areas: power, tra···
In deep foundation excavation, dig depth determines whether the design elevation can be reached in o···
Mine stripping, rocky soil excavation, and general earthmoving impose different wear patterns on a d···
Power and digging force only indicate instantaneous capability; continuous operation also depends on···
In multi-stage earthworks, a medium bulldozer often has to cover general dozing, site leveling and h···
Landfill compaction and roadbed compaction may both appear to be "compaction," but the material prop···
In municipal roadbed compaction, layer thickness, compaction passes, and equipment parameters must a···
For open-pit mining, large earthmoving, and heavy-duty loading scenarios, this explains that load-se···
Earthmoving sites often treat bulldozers as universal machines that can take on any job, but pushing···
High-volume truck loading cannot be judged by tonnage alone. Starting from how to read machine speci···
We manufacture bulldozers, excavators, loaders, road rollers, pipe layers and attachments for a wide range of construction projects.
© 2026 Shanbo Construction Machinery All rights reserved.