Tonnage: Under 13 t
Compact dimensions, agile steering, easy operation and low fuel consumption.
Tonnage: 13–23 t
Balanced power, broad application and good value.
Tonnage: Over 23 t
Powerful engines, strong traction, large blades and a durable structure for demanding work.
Tonnage: 1–6 t
Compact, maneuverable, easy to relocate and fuel-efficient.
Tonnage: 6–13 t
Versatile compact excavators offering good value for general construction.
Tonnage: 13–30 t
Versatile flagship models for a broad range of excavation tasks.
Tonnage: 30–50 t
High efficiency and large bucket capacity for heavy-duty work.
Tonnage: 4–20 t
High mobility with low transport costs and reduced impact on paved surfaces.
Tonnage: Under 3 t
Compact, maneuverable and fuel-efficient for work in tight spaces.
Tonnage: 3–6 t
Steady performance, strong load capacity and smooth, energy-efficient operation.
Tonnage: Over 6 t
Heavy-duty construction, strong output and high efficiency for large projects.
Tonnage: Under 2.5 t
Compact size, zero-radius turning and quick attachment changes for versatile operation.
Tonnage: 4 to 8 t and above
Strong digging force, load capacity and stability for heavy-duty work.
Tonnage: 10–25 t
Compact, easy to relocate and stable for small and medium pipeline projects.
Tonnage: 25–45 t
Balanced lifting performance, stability and traction for a wide range of pipeline work.
Tonnage: Over 45 t
High lifting capacity, strong traction and a stable chassis for heavy, large-diameter pipes.
Tonnage: 6–26 t
Deep compaction, strong vibration and traction for road foundations.
Tonnage: 3–14 t
Dual-drum vibration and uniform compaction for smooth asphalt surfaces.
Tonnage: 16–30 t
Kneading compaction for dense, uniform surfaces, mainly for final asphalt compaction.
Tonnage: 0.8–3 t
Compact, easy to operate and maneuverable in confined spaces.
Tonnage: 20–35 t
Strong compaction, a durable structure and wear and corrosion resistance for landfill work.
Expert support · Worldwide shipping
When uneven subgrade settlement occurs, the compaction plan cannot rely solely on increasing passes.···
Earthwork sites with both soft soil and slopes impose dual constraints on crawler excavators regardi···
Determining the class for heavy-duty haulage in mines cannot rely solely on horsepower or tonnage. T···
When deep foundation pit excavation and high-level dumping occur on the same site, excavator capabil···
Mid-size dozers often come in multiple application-specific versions, and buyers tend to compare onl···
Urban municipal earthwork is often constrained by narrow work areas, overlapping tasks, and multi-po···
Before earthmoving equipment is mobilized, checking items in the order of blade and material, underc···
This article compares the operational objectives, material characteristics, site bearing capacity, a···
There is no universal answer for the number of roadbed compaction passes; it is jointly affected by ···
When a medium crawler excavator is used for loading, what affects coordination is not a single bucke···
When facing soft wetland, bulk material yards, landfill and other different working conditions, the ···
For those preparing to read technical specifications of super-large mining excavators and assess sui···
We manufacture bulldozers, excavators, loaders, road rollers, pipe layers and attachments for a wide range of construction projects.
© 2026 Shanbo Construction Machinery All rights reserved.