Tonnage: Under 13 t
Compact dimensions, agile steering, easy operation and low fuel consumption.
Tonnage: 13–23 t
Balanced power, broad application and good value.
Tonnage: Over 23 t
Powerful engines, strong traction, large blades and a durable structure for demanding work.
Tonnage: 1–6 t
Compact, maneuverable, easy to relocate and fuel-efficient.
Tonnage: 6–13 t
Versatile compact excavators offering good value for general construction.
Tonnage: 13–30 t
Versatile flagship models for a broad range of excavation tasks.
Tonnage: 30–50 t
High efficiency and large bucket capacity for heavy-duty work.
Tonnage: 4–20 t
High mobility with low transport costs and reduced impact on paved surfaces.
Tonnage: Under 3 t
Compact, maneuverable and fuel-efficient for work in tight spaces.
Tonnage: 3–6 t
Steady performance, strong load capacity and smooth, energy-efficient operation.
Tonnage: Over 6 t
Heavy-duty construction, strong output and high efficiency for large projects.
Tonnage: Under 2.5 t
Compact size, zero-radius turning and quick attachment changes for versatile operation.
Tonnage: 4 to 8 t and above
Strong digging force, load capacity and stability for heavy-duty work.
Tonnage: 10–25 t
Compact, easy to relocate and stable for small and medium pipeline projects.
Tonnage: 25–45 t
Balanced lifting performance, stability and traction for a wide range of pipeline work.
Tonnage: Over 45 t
High lifting capacity, strong traction and a stable chassis for heavy, large-diameter pipes.
Tonnage: 6–26 t
Deep compaction, strong vibration and traction for road foundations.
Tonnage: 3–14 t
Dual-drum vibration and uniform compaction for smooth asphalt surfaces.
Tonnage: 16–30 t
Kneading compaction for dense, uniform surfaces, mainly for final asphalt compaction.
Tonnage: 0.8–3 t
Compact, easy to operate and maneuverable in confined spaces.
Tonnage: 20–35 t
Strong compaction, a durable structure and wear and corrosion resistance for landfill work.
Expert support · Worldwide shipping
Before starting heavy-duty mine hauling, the focus of a readiness check is not listing specification···
Landfill compaction and roadbed compaction differ markedly in material properties, lift organization···
Dam and port fill projects often involve thick layers of large-particle rockfill or aggregate, which···
The tonnage class of a crawler excavator reflects its overall weight range and does not directly equ···
Multi-task earthworks contract sections often involve dozing, rough grading, wetland passage and rip···
Loading efficiency cannot be judged by bucket capacity alone. Using a 21-ton class crawler excavator···
Before earthmoving begins, the same crawler dozer may require different versions depending on materi···
The working coverage and loading coordination of medium crawler excavators are often conflated. Base···
Tight sites and mid-small earthworks often face limited turning space, restricted ground bearing cap···
Hard-soil excavation and routine earthmoving truck loading place different demands on a medium crawl···
Low-emission sites considering a pure electric dozer cannot rely on zero emissions alone. This artic···
Landfill compactor data pages often list crushing width and compaction capacity side by side, but th···
We manufacture bulldozers, excavators, loaders, road rollers, pipe layers and attachments for a wide range of construction projects.
© 2026 Shanbo Construction Machinery All rights reserved.