Tonnage: Under 13 t
Compact dimensions, agile steering, easy operation and low fuel consumption.
Tonnage: 13–23 t
Balanced power, broad application and good value.
Tonnage: Over 23 t
Powerful engines, strong traction, large blades and a durable structure for demanding work.
Tonnage: 1–6 t
Compact, maneuverable, easy to relocate and fuel-efficient.
Tonnage: 6–13 t
Versatile compact excavators offering good value for general construction.
Tonnage: 13–30 t
Versatile flagship models for a broad range of excavation tasks.
Tonnage: 30–50 t
High efficiency and large bucket capacity for heavy-duty work.
Tonnage: 4–20 t
High mobility with low transport costs and reduced impact on paved surfaces.
Tonnage: Under 3 t
Compact, maneuverable and fuel-efficient for work in tight spaces.
Tonnage: 3–6 t
Steady performance, strong load capacity and smooth, energy-efficient operation.
Tonnage: Over 6 t
Heavy-duty construction, strong output and high efficiency for large projects.
Tonnage: Under 2.5 t
Compact size, zero-radius turning and quick attachment changes for versatile operation.
Tonnage: 4 to 8 t and above
Strong digging force, load capacity and stability for heavy-duty work.
Tonnage: 10–25 t
Compact, easy to relocate and stable for small and medium pipeline projects.
Tonnage: 25–45 t
Balanced lifting performance, stability and traction for a wide range of pipeline work.
Tonnage: Over 45 t
High lifting capacity, strong traction and a stable chassis for heavy, large-diameter pipes.
Tonnage: 6–26 t
Deep compaction, strong vibration and traction for road foundations.
Tonnage: 3–14 t
Dual-drum vibration and uniform compaction for smooth asphalt surfaces.
Tonnage: 16–30 t
Kneading compaction for dense, uniform surfaces, mainly for final asphalt compaction.
Tonnage: 0.8–3 t
Compact, easy to operate and maneuverable in confined spaces.
Tonnage: 20–35 t
Strong compaction, a durable structure and wear and corrosion resistance for landfill work.
Expert support · Worldwide shipping
This article covers preparation before a hydrostatic bulldozer enters a site: first clarifying work ···
Loading task allocation is not determined solely by bucket capacity or tonnage. This article examine···
The same mid-size crawler dozer is often offered in standard and super wetland versions, and buyers ···
Continuous truck loading requires the excavator to maintain coordinated motion during combined opera···
Earthwork and grading on narrow sites often cannot be solved simply by shrinking a medium dozer. Sta···
For landfill equipment buyers who see crushing width and compaction capacity on spec sheets but do n···
Municipal road subgrade layered compaction is often simplified to 'choose a roller,' but in practice···
Before a large crawler excavator enters a mine, beyond checking digging and loading capacity, it is ···
Whether a battery-electric dozer can handle a full shift of pushing depends less on horsepower than ···
For high-volume earthmoving and truck loading, many buyers compare bucket capacity or tonnage first ···
General earthmoving and mine stripping place discontinuous demands on bulldozers: material density, ···
Addressing the common misconception that a larger tonnage is always better for truck loading, this a···
We manufacture bulldozers, excavators, loaders, road rollers, pipe layers and attachments for a wide range of construction projects.
© 2026 Shanbo Construction Machinery All rights reserved.