Tonnage: Under 13 t
Compact dimensions, agile steering, easy operation and low fuel consumption.
Tonnage: 13–23 t
Balanced power, broad application and good value.
Tonnage: Over 23 t
Powerful engines, strong traction, large blades and a durable structure for demanding work.
Tonnage: 1–6 t
Compact, maneuverable, easy to relocate and fuel-efficient.
Tonnage: 6–13 t
Versatile compact excavators offering good value for general construction.
Tonnage: 13–30 t
Versatile flagship models for a broad range of excavation tasks.
Tonnage: 30–50 t
High efficiency and large bucket capacity for heavy-duty work.
Tonnage: 4–20 t
High mobility with low transport costs and reduced impact on paved surfaces.
Tonnage: Under 3 t
Compact, maneuverable and fuel-efficient for work in tight spaces.
Tonnage: 3–6 t
Steady performance, strong load capacity and smooth, energy-efficient operation.
Tonnage: Over 6 t
Heavy-duty construction, strong output and high efficiency for large projects.
Tonnage: Under 2.5 t
Compact size, zero-radius turning and quick attachment changes for versatile operation.
Tonnage: 4 to 8 t and above
Strong digging force, load capacity and stability for heavy-duty work.
Tonnage: 10–25 t
Compact, easy to relocate and stable for small and medium pipeline projects.
Tonnage: 25–45 t
Balanced lifting performance, stability and traction for a wide range of pipeline work.
Tonnage: Over 45 t
High lifting capacity, strong traction and a stable chassis for heavy, large-diameter pipes.
Tonnage: 6–26 t
Deep compaction, strong vibration and traction for road foundations.
Tonnage: 3–14 t
Dual-drum vibration and uniform compaction for smooth asphalt surfaces.
Tonnage: 16–30 t
Kneading compaction for dense, uniform surfaces, mainly for final asphalt compaction.
Tonnage: 0.8–3 t
Compact, easy to operate and maneuverable in confined spaces.
Tonnage: 20–35 t
Strong compaction, a durable structure and wear and corrosion resistance for landfill work.
Expert support · Worldwide shipping
Pre-start readiness for heavy-duty mine hauling is not just about whether horsepower is sufficient; ···
The operation of a domestic waste landfill is not simply flattening the surface, but a cyclic proces···
In asphalt paving and municipal road compaction, roller scheduling is often constrained by paving sp···
"Medium" is a class designation, not a fixed capability list. Focusing on earthwork excavation and t···
For three job targets—landfill sites, coal-yard bulk material and rock conditions—this breaks down h···
For buyers and site staff who need to verify the loading and travel capability of a mid-size crawler···
Multi-process earthworks often combine dozing, grading, ripping and loose-material handling on one m···
Deep pit operations impose prerequisites on ultra-heavy mining excavators in terms of working range,···
Addressing the question of what ground a medium bulldozer equipped with a ripper can handle, this ar···
On landfill compactor spec sheets, compaction width, spreading depth, gradeability, and blade dimens···
For asphalt surface and base compaction, this article explains how to determine the matching directi···
Heavy excavator loading capability cannot be judged by tonnage alone. This article examines constrai···
We manufacture bulldozers, excavators, loaders, road rollers, pipe layers and attachments for a wide range of construction projects.
© 2026 Shanbo Construction Machinery All rights reserved.